A few weeks after the introduction of the DEGERtracker S100 on the market, the construction of the first solar park with the new single-axis tracking system from DEGER has already started. 150 DEGERtracker S100 with a capacity of 1.75 MW will be installed in the Turkish province of Hatay. In the first building phase, the substrate was prepared for the pile foundation. In spring 2017 the solar park will be connected to the grid.